Projects Portfolio

ZIPL Projects & Case Studies | Tunnels, Highways, Hydropower

Browse ZIPL’s portfolio: hydropower projects, NHAI highways, tunnel works and transmission lines across Jammu & Kashmir and neighbouring states

Our experience spans hydropower installations, highway utilities, road construction and tunnelling. Below are signature projects where ZIPL delivered complex civil solutions.

Featured Projects

URI-I & II (Hydropower)
URI-I & II (Hydropower)

Scope: Civil works and allied infrastructure.

Key deliverables: Rock excavation, concrete linings, access works.

BHEP-I & II (900 MW)
BHEP-I & II (900 MW)

Scope: Major hydroelectric civil works.

Highlights: Quality-critical concreting and underground support systems.

• Jammu Ring Road — Utility Works (Electric & PHE) — 57.60 km
Jammu Ring Road — Utility Works (Electric & PHE) — 57.60 km

Scope: Utility corridors, transmission poles, conduit works and allied road-associated civil works.

Jammu–Qazigund Highway
Jammu–Qazigund Highway — Tunnel Works

Scope:Tunnel excavation and lining works on a strategic highway corridor.

water conduction tunnel, kargil (leh)
Water Conduction Tunnel, Kargil (Leh)

Scope:Water conveyance tunnel in cold, logistically-challenging terrain.

URI-I & II (Hydropower)
2.5 MW Hydro Power Project

Scope:Small hydro civil works including intake, penstock anchoring, and powerhouse foundations.

Transmission Line Works (132 KV & 33 KV)
Transmission Line Works (132 KV & 33 KV)

Scope:Tower foundations, erection and testing under NHAI projects.

ring road (35 km) — road construction
Ring Road (35 km) — Road Construction

Scope:Earthworks, subgrade, pavement and highways utilities.